Atlantis
the Royal

With its world-class unique design, Dubai's Atlantis the Royal has again proven its status as the No. 1 overseas high-end building performance.

  • Location

    Dubai, UAE

  • Completion
    Date

    February 2023

  • Client

    ICD

  • Construction
    overview

    6 buildings /
    44 floors, 795 rooms /
    231-unit residential building

  • Scale

    408,074ⅿ²

Standard for luxury.

Luxury

  • Luxury
    Standard for luxury.

    Atlantis the Royal, world-class architectural masterpiece becomes a new standard for luxury

World Class

World Class Proven in Numbers

  • Total
    construction cost

    USD1.254 billion dollars

  • Total scale

    408,074

  • Total number of
    swimming pools

    94

  • Hotel and
    residence

    795rooms 231households

  • Number of
    GFRC panels

    33,000

  • Infinity pool length

    90m

Luxury Landmark

Luxury masterpiece construction completed with craftsmanship and technology

A high-rise luxury complex, the birth of a new landmark

Atlantis The Royal is a super-luxury hotel and residence complex located in the Palm Jumeirah, an artificial archipelago in Dubai, United Arab Emirates. This project consists of three 44-story hotel buildings (total 795 rooms) and three 39-story high-end residence buildings (total 231 units). It is a large-scale project with a total construction cost of approximately 1.254 billion dollars.

Sky Bridge

Unique Design

S-shaped atypical exterior, world's only design

Atlantis The Royal Hotel boasts an atypical exterior curved in the shape of 'S' when viewed from the sky and looks like Lego blocks stacked up.

The exterior, which overwhelms the eyes, has a unique structure that cannot be found anywhere else in the world, and is a masterpiece of luxury architectural art that creates a unique visual effect.

S-shaped atypical exterior

Unique Design

Sky Bridge connecting two buildings

The towers, which are connected by 'Sky Bridge' installed 82m above ground, were installed through a special process of lifting with Strand Jack after pre-assembly.

On the rooftop on the 22nd floor of the hotel, a 90m long Sky Pool connected by the Sky Bridge spreads, providing Dubai's unique skyline and the Gulf view to all rooms.

Technology

Advanced Precision Construction Techniques

GFRC Panel 33,000 panels

The S-shaped curved façade was built with over 33,000 precisely installed GFRC panels, each joined with a uniform 5mm gap—an advanced construction feat achieved with perfection.

GGBS Ground Granulated Blast-furnace Slag

GGBS was applied to reduce carbon emissions, and high-strength concrete was applied to reduce the cross-sectional size and the amount of reinforcing steel.

Formwork System

To achieve a 7-day construction cycle, customized formwork systems were applied to core walls, slabs, and columns across all tower sections.

Concrete Conveyance Concrete Conveyance Planning

As the six towers vary in height, static pumps with different capacities were assigned to each tower based on the required vertical pumping distance.

Steel Structure

The steel structure installation method was used for the Main bridge, Cantilever, and Sky court

Refusal of unauthorized collection of email addresses

We refuse to collect email addresses posted on this website without permission using email
collection programs or other technical devices, and any violation will be subject to criminal
punishment under the Information and Communications Network Act.

Please note that we will take legal action if you use phrases in the email subject or send an email
that is misleadingly written to be sent by Ssangyong E&C without our prior permission.